SETI bioastro: Fw: Gravity Probe B Update -- July 23, 2004

From: LARRY KLAES (ljk4_at_msn.com)
Date: Sat Jul 24 2004 - 10:30:07 PDT

  • Next message: LARRY KLAES: "SETI bioastro: Fw: Mars Odyssey THEMIS Images - July 19-23, 2004"

    ----- Original Message -----
    From: Bob Kahn<mailto:kahn_at_relgyro.stanford.edu>
    To: gpb-update_at_lists.Stanford.EDU<mailto:gpb-update_at_lists.Stanford.EDU>
    Sent: Friday, July 23, 2004 10:11 PM
    Subject: Gravity Probe B Update -- July 23, 2004

    =========================================
    GRAVITY PROBE B MISSION UPDATE -- July 23, 2004
    =========================================
    Please Note: During the Initialization & Orbit Checkout (IOC) Phase
    of the GP-B mission, we update our Web site and send out this email
    update once a week (usually on Thursday or Friday) to keep you
    apprised of our progress. From time to time, we may send out extra
    updates, as warranted by mission events.

    One day #94 of the mission, Gravity Probe B is poised to enter the
    home stretch of the Initialization and Orbit Checkout (IOC) phase of
    the mission. The spacecraft is in excellent health, and all
    subsystems are continuing to perform well. All four gyros are
    digitally suspended, with gyros #2 and #4 spinning at science mission
    speed-greater than 80Hz (4,800 rpm). Gyros #1 and #3 are spinning at
    less than 1.5 Hz (90 rpm) and are ready for full-speed spin-up next
    week. Fine-tuning of the Attitude and Translation Control system
    (ATC) is still in progress, and the ATC is performing well. The
    spacecraft's roll rate is 0.52 rpm, and the science telescope is
    locked onto the guide star, IM Pegasi.

    Last Friday, the full-speed spin-up of gyro#2 went smoothly, with a
    final spin rate of 87 Hz (5,220 rpm). Helium gas leakage from the
    spin-up of gyro #2 caused gyro #4 to slow down from 105.8 Hz (6,348
    rpm) to 91 Hz (5,460 rpm). We had hoped that gyro #2 would achieve a
    spin rate above 100 Hz (6,000 rpm), with less leakage effect on gyro
    #4. Thus, rather than spinning up gyros #1 and #3 as originally
    planned, we spent the past week doing analysis and running tests-both
    on the spacecraft and here at Stanford-in order to ensure that the
    upcoming spin-up of gyros #1 and #3 will result in higher speeds,
    with less leakage effect on the remaining gyros.

    The spin rate of the gyros during the Science Phase of the mission
    affects the signal-to-noise ratio in the SQUID readouts of the
    experimental data. The noise level is quite small, but constant. The
    higher the gyro spin rate, the larger the London moment (magnetic
    field created by a spinning superconductor), and thus, the greater
    the signal-to-noise ratio. In ground testing prior to launch, we
    determined that a spin rate of 80 Hz (4,800 rpm) or greater for each
    gyro would provide a good signal-to-noise ratio for the science
    mission. However, the threshold of 80 Hz (4,800) rpm is not a hard
    and fast limit, so if the final spin rate of one or more gyros falls
    slightly below this value, this will not appreciably compromise the
    science data.

    One way to potentially increase the spin-up rate of the remaining two
    gyros, while reducing the amount of helium gas leakage during spin-up
    is to use the Gyro Suspension System to position the gyro rotors
    closer to the spin-up channel in the gyro housing. Tests and analysis
    performed this past week indicate that we can move the rotors of
    gyros #1 and #3 up to 30% closer to the spin-up channels than gyros
    #2 and #4, and still have a safe margin of clearance from the
    suspension electrodes and the gyro housings. We have also determined
    that opening a second exhaust valve during spin-up may help to reduce
    the pressure in the probe caused by helium leakage, thereby reducing
    the spin-down effects on the remaining gyros. Both of these changes
    will be implemented in the spin-up of gyros #1 and #3 next week.

    Also, this past week, we continued fine-tuning the drag-free software
    used by the Attitude and Translation Control system (ATC) to optimize
    its performance at the current and final spacecraft roll rate of 0.52
    rpm. Tests from parameter changes we made to the ATC system indicate
    that we have reduced the time it takes to re-lock onto the guide star
    from as much as 15 minutes to less than 2 minutes.

    The spacecraft is being controlled from the Gravity Probe B Mission
    Operations Center, located here at Stanford University. The
    Stanford-NASA/MSFC-Lockheed Martin operations team is continuing to
    perform superbly.

    TOUR THE GP-B SPACECRAFT & PAYLOAD ON OUR WEB SITE
    ============================================
    You can take a visual tour of the GP-B spacecraft and payload by
    using the navigation menu along the left edge of our Web pages.
    Choose the second item, The Engineering Story, and from that
    sub-menu, choose Visual Tour, or simply enter the following URL into
    your Web browser:
    http://einstein.stanford.edu/content/vehicle_tour/index.html>

    BUILD A PAPER MODEL OF THE GP-B SPACECRAFT
    =====================================
    We have created a 1/20 scale, paper model of the GP-B spacecraft that
    you can download as a PDF file, print out, and assemble. There are
    two versions of the PDF file-a 6 MB high-quality version and a 2.2 MB
    standard-quality version. The only visible difference between the
    versions is that the colors are not as bright and saturated in the
    standard version, but it will download in much less time for people
    with low-speed Internet connections. The URL for these PDF files is:
    http://einstein.stanford.edu/p_model>.

    Both versions include two pages of instructions and six pages of
    images to cut out and assemble. You'll need scissors, an Exacto
    knife, a straight edge, glue (glue sticks and hot glue guns work
    well), Scotch tape, two 9.5" long, 1/8" diameter wooden dowels
    (shish-kabob skewers work well) about 3-5 hours, and patience to
    assemble the model. For best results, we suggest printing the six
    cut-out pages on heavyweight paper. Although it is a bit hard to work
    with, glossy photo paper will yield a very realistic looking model.

    LEARN MORE ABOUT OUR GUIDE STAR, IM PEGASI
    =====================================
    The Harvard-Smithsonian Center for Astrophysics (Cambridge) and York
    University (Toronto) are studying the guide star to provide crucial
    measurements of its motion relative to far away quasars. These
    measurements are needed to relate the tiny changes in the gyroscopes'
    spin direction to the distant universe, so that general relativity
    can be tested. Learn more about these measurements by going to the IM
    Pegasi web site:
    http://www.yorku.ca/bartel/guidestar/>

    In addition, you'll find information in the Guide Star FAQ on our Web
    site:
    http://einstein.stanford.edu/content/faqs/faqs.html#guidestar>
    and on pages 18-20 of the Gravity Probe B Launch Companion:
    http://einstein.stanford.edu/highlights/GP-B_Launch_Companion.pdf>.

    LEARN MORE ABOUT GRAVITY PROBE B & IOC
    ==================================
    Our GP-B Web site,
    http://einstein.stanford.edu> contains lots of
    information about the Gravity Probe B experiment, general relativity,
    and the amazing technologies that were developed to carry out this
    experiment.

    If you are interested in following the IOC procedures more closely,
    you'll find a schedule and description of them on pages 12-14 of the
    "Gravity Probe B Launch Companion." You can download a copy of this
    document, in Adobe Acrobat PDF format, from
    http://einstein.stanford.edu/highlights/GP-B_Launch_Companion.pdf>.

    TRACK THE GP-B SATELLITE ON THE WEB OR WITH YOUR PDA
    =============================================
    You can track the GP-B satellite on the Web using NASA's Java-based
    J-Pass satellite tracking application at:
    http://science.nasa.gov/realtime/JPass/>

    Also, Big Fat Tail Productions (http://www.bigfattail.com>) has
    created shareware satellite tracking software that runs on Personal
    Digital Assistants (PDAs) using either the Palm OS or Pocket PC
    operating systems. Like all PDA shareware, you can try out either
    version for free. If you like the software and decide to use it, Big
    Fat Tail asks that you pay a nominal shareware fee.

    FOLLOW THE GP-B MISSION ELSEWHERE ON THE INTERNET
    ==============================================
    In addition to our Stanford GP-B Web site, the ELV Missions Virtual
    Launch Center Web page on the John F. Kennedy Space Center Web site
    has information and several streaming video clips covering the GP-B
    mission. The URL is:
    http://www.ksc.nasa.gov/elvnew/gpb/vlcc.htm>.
    (You can view these video clips free of charge, but you will need to
    have either the Real Media Player or Windows Media Player installed
    on your computer to view them.)

    NASA's Marshall Space Flight Center Gravity Probe B.com Web page
    (
    http://www.gravityprobeb.com> ) has a number of great photos from the
    GP-B launch, including photos of the spacecraft separation, as well
    as other information about Gravity Probe B.

    ABOUT THE GPB-UPDATE EMAIL LIST
    ============================
    The email distribution list for this GP-B Weekly Highlights update is
    maintained on the Stanford University email lists server. These email
    updates are automatically sent to GP-B program internal email
    distribution lists at Stanford, Lockheed Martin, and NASA. If your
    email address is not included in one of these distribution lists, you
    have subscribed--or been subscribed by someone else--to this email
    list.

    If this email update was forwarded to you by someone else and you
    wish to subscribe, simply send an email message to
    "
    majordomo_at_lists.Stanford.edu<mailto:majordomo_at_lists.Stanford.edu>" with the command "subscribe
    gpb-update" in the body of the message (not in the Subject line).

    You can unsubscribe at any time by sending an email message to
    "majordomo_at_lists.Stanford.edu<mailto:majordomo_at_lists.Stanford.edu>" with the command, "unsubscribe
    gpb-update" in the body of the message.

    -- 
    **********************************
    NASA - Stanford - Lockheed Martin
        Gravity Probe B Program
    "Testing Einstein's Universe"
      http://einstein.stanford.edu>
    Bob Kahn
    Public Affairs Coordinator
    Phone: 650-723-2540
    Fax:   650-723-3494
    Email: kahn_at_relgyro.stanford.edu<mailto:kahn_at_relgyro.stanford.edu>
    **********************************
    

  • Next message: LARRY KLAES: "SETI bioastro: Fw: Mars Odyssey THEMIS Images - July 19-23, 2004"

    This archive was generated by hypermail 2.1.6 : Sat Jul 24 2004 - 11:59:45 PDT